You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Air di Jl Kelapa Dua Wetan Terus Dikebut

Channel Construction on Jalan Kelapa Dua Wetan Accelerated

The construction of a new 486-meter-long water channel on Jalan Raya Kelapa Dua Wetan, Ciracas, East Jakarta, continues to be accelerated. The work carried out since October 9 has now progressed to more than 43 percent.

It is targeted to be completed on December 15

Development and Drainage Improvement Division Head, Tengku Saugi Zikri expressed the channel was built to follow up on residents' aspirations through the Musrenbang forum.

"It is targeted to be completed on December 15," he stated, Monday (11/20).

Jakarta Holds Mass Cleanup Action in Anticipation of Rainy Season

He explained the channel was being built using U-Ditch material measuring 80x80 centimeters over a length of 445 meters and a box culvert measuring 80 centimeters over a length of 27 meters, as well as a box culvert measuring 100 centimeters over a length of 14 meters.

"Hopefully, it can be completed on time," he hoped.

Reporter : Nurito

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1118 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye603 personDessy Suciati
  3. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye557 personFakhrizal Fakhri
  4. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye545 personBudhi Firmansyah Surapati
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye528 personNurito